Concrete Fibre Dosage and Mixing Guide
There is no single dosage that works for every concrete fibre project.

Dosage depends on project conditions.
Dosage depends on the application, fibre type, concrete mix, placement method and performance target.
Use these points before quotation.
| Step | Topic | Practical note |
|---|---|---|
| 1 | Define the application | A floor, tunnel lining and mortar mix should not start with the same assumption. |
| 2 | Review fibre type | Steel, synthetic and micro fibres behave differently in mixing. |
| 3 | Plan mixing sequence | Control feeding speed and mixing time to reduce site problems. |
| 4 | Reduce balling risk | Check fibre geometry, dosage, aggregate and moisture conditions. |
| 5 | Send project details | Share mix, pump, dosage target, standard and application before quotation. |
Use customer files to make the page feel complete.
The resource pages now include brochure pages, datasheet visuals, factory or packing references instead of relying on text only.
How to use this page before contacting SHWITCOM.
The goal is to turn technical reading into a complete inquiry package.
Read
Identify the application, fibre type and document needed.
Compare
Open the related product or application page to compare options.
Prepare
Collect drawing, standard, dosage, quantity and packing preference.
Confirm
Ask SHWITCOM for the matched datasheet, packing photo and quotation.
Order
Finalize sample, label, pallet and shipment details.
Send the project condition. We will quote the usable fibre.
Application, country, estimated quantity, packing preference and any technical requirement are enough to start.